Busbar installation process
Before installing the aluminum busbar, you can use a copper
wire brush to remove the oxide layer on the surface of the busbar contact. It
can be installed directly (immediately). For example, if the oxide-removed
aluminum busbar is placed for a period of time, the above work must be performed
first. Can be installed afterwards.
8.2 When copper and aluminum are overlapped, the copper bar
must be tinned and ensure that the aluminum bar connection cannot be deformed
after being pressed
8.3 Fasteners for connection (bolts, spring washers, flat
washers, nuts, etc.) shall comply with national standards, and are refined or
semi-finished products of galvanized yellow.
8.4 The penetration direction of the bolts used for
connection should be from bottom to top, from back to front, from left to right.
In the remaining cases, the nut is placed on the maintenance side. The diameter
of the bolt is selected according to the size of 1 to 1.5 mm smaller than the
connection hole. The length is suitable for exposing the nut 2~3 buckle after
flattening the spring washer.It is never allowed to exceed the diameter of the
bolt itself or be retracted into the nut.There must be corresponding flat
washers on both sides of the bolt, and the smooth surface of the flat washer
faces outward. The washers of adjacent bolts should have a clear distance of
more than 3 mm to prevent the heating of the magnetic circuit, and the
corresponding spring pads should be added on the nut side.
8.5 The connection between the busbars should be tight. The
contact is good. The configuration is neat and beautiful. The contact surface is
checked with a 0.05×10 mm feeler gauge to meet the following requirements: the
busbar width is more than 80mm, and it cannot be inserted into 6mm; the width is
50mm or less, and it should not be plugged Into 4mm.
8.6 Painting: (Not adopted by our company)
8.6.1 The surface of the busbar should be painted and the
paint should be even. The adhesion is firm, and there should be no phenomena
such as layering, wrinkling, sagging, etc., in the low-voltage cabinet. For the
busbar with more connection holes in the box, the paint is not Beautiful and
difficult to operate can be tinned as a whole.
8.6.2 The two sides of the joint are not painted at a
distance of 10mm. The starting and ending points of the three-phase busbars
should be kept neat, and the allowable error between the three phases is 2.5mm.
8.7 Fixed
8.7.1 The distance between the two fixed points of the
horizontal row and the vertical row is less than or equal to 1m, and more than
1m must be added with fixed points.
8 multifunction cnc
busbar machine processing center.7.2 At least two fixing points are required
to fix the horizontal row and the vertical row, and it is strictly prohibited to
fix with one fixing point.
8.7.3 The fixing of copper bars is made of insulators, epoxy
boards and other insulating materials.